Home Warranty Insurance by State: When Your Builder Must Have It
When home building insurance becomes compulsory in New South Wales, Queensland, Victoria, Western Australia and South Australia, what to see on the certificate before you pay a deposit and how long you have to claim, read on official pages on 14 November 2026.
Updated

Must your builder insure this contract?
If a builder dies, vanishes or goes broke halfway through, this insurance is what is left. The builder buys it for your property, so it is worth knowing before you sign whether your state makes it compulsory. Pick the state and the contract price.
Figures come from official pages opened on 14 November 2026. Lines and cover levels change often, so ask the builder for the certificate and check it with the state scheme.
Scheme, line and claim windows side by side
| State | Scheme and line | How long you have |
|---|
Tasmania, the ACT and the Northern Territory carry no figures because we could not read an official page for them.
Four things to see on the certificate before you pay
- Your property address. A certificate for another job, or one with no address, is a warning sign.
- You as the owner. The cover is bought for your property, so your name should be on it.
- The contract price. If the certificate shows a lower figure than your contract, ask why before the deposit goes.
- The same business as the contract. The name that signs your contract and the name on the certificate should match.
A backstop, not a promise that the work is right
What it answers
The builder has died, disappeared or become insolvent before finishing, or finished work turns out faulty. It is a last resort and the claim windows can be short. In Queensland, a defect outside structure has to be noticed within six months of the work being substantially complete.
What it does not answer
A builder who is still trading and simply slow, a design you dislike or a job that costs more than quoted. Those go back to the contract, to written variations and to the state complaint service. The deposit guide, how much deposit a builder can ask for, covers what to hold back and when.
How far to trust this page
Each line comes from an official page opened on 14 November 2026, and the date of each page is in the table. Victoria is the shakiest row, because a page updated in December 2025 moves the line to $20,000 from 1 July 2026 while a page from July 2025 still says $16,000. Ask for the policy on any Victorian job near either figure. Tasmania, the ACT and the Northern Territory were left out rather than guessed. The sources are collected on how BuildTradie chooses.